Industrial Facility Heating Upgrade – Energy-Efficient, Year-Round Solution

Multi-Zone Heating Installation

Comprehensive Heating Upgrade for Industrial Facility

An industrial facility required a full heating system upgrade across several key areas, including the Main Hall, Warehouse, Tool Stores, and Gluing Hall. The existing systems were outdated, inefficient, and needed replacing to ensure reliable, energy-efficient heating.

Multi-Zone Heating Installation

ABS delivered a bespoke heating solution, supplying and installing Winterwarm heaters and de-stratification fans throughout the facility, alongside electrical upgrades, control systems, and flue installations. The project also included modifying old heaters for summer ventilation.

Tailored, Energy-Efficient Heating System

We installed a zone-specific heating system to suit the unique demands of each area, combining new high-efficiency heaters and de-stratification fans for optimal performance. The project was carefully planned to minimise disruption and maximise energy savings.

  • Spanner Icon

    Supplied and installed Winterwarm warm air heaters and de-stratification fans across four facility zones.

  • World

    Installed control systems, wiring, flues, and new power supplies to ensure safe, efficient operation.

  • Pen icon

    Modified old heaters to operate as summer ventilation systems, adding year-round value.

Content Image 1

Energy-Efficient, Versatile Heating System

The facility now benefits from an efficient, fully commissioned heating solution with improved heat distribution, reduced energy costs, and enhanced working conditions. Year-round comfort is now achieved thanks to the dual heating and summer ventilation capabilities.

Some of the brands we work with:

Get in touch

ABS Ltd are approved installers so do not hesitate to the industry experts.We will be happy to provide a free site survey and no obligation quotation.

Phone Icon

Book a free site survey