Efficient Heating Upgrade for Tyne & Wear Council Facility

Seamless Heating System Replacement

Heating System Upgrade for a Tyne & Wear Council Facility

Seamless Heating System Replacement

Seamless Heating System Replacement

ABS conducted a full site survey to assess the heating requirements and proposed a like-for-like replacement to ensure minimal disruption. The project included the supply and installation of seven 100kW Photon Warm Air Heaters, new control systems, flues, and all necessary electrical and gas connections.

Efficient, Low-Disruption Heating Installation

Our solution allowed us to integrate new heaters into the existing gas infrastructure, significantly reducing installation time and costs. By carefully planning and coordinating with the council, we ensured the upgrade was completed efficiently and to the highest safety standards.

  • Supplied and installed 7 x 100kW Photon Warm Air Heaters by Reznor for reliable, energy-efficient heating.

  • Installed new control systems, flues, and electrical components to improve system safety and ease of operation.

  • Utilised the existing gas pipework to minimise disruption, reduce installation time, and keep project costs down.

Content Image 1

Reliable, Energy-Efficient Heating Solution

The project was delivered on time and to specification. The new heating system provides efficient, consistent warmth throughout the facility, improving user comfort while reducing energy costs. The council now benefits from a modern, easy-to-control system with improved reliability.