ABS conducted a comprehensive site survey and provided a tailored heating upgrade. The project involved the supply and installation of three Space Ray heaters, integration with existing wiring and gas supply, and the addition of new flues to complete the system efficiently and cost-effectively.

Smart, Energy-Efficient Heating Installation

Our team proposed and installed a solution that maximised efficiency and sustainability by reusing existing infrastructure. We selected Space Ray heaters for their performance and energy savings, ensuring minimal disruption and a smooth installation process.

  • Supplied and installed 2 x LRL25 Space Ray heaters (23kW each) to provide reliable, targeted heating.

  • Installed 1 x LRDL25 Space Ray heater (46kW) for additional heating coverage in high-demand areas.

  • Reused existing wiring and gas supply, integrating new flues to keep costs down and maintain system efficiency.

Content Image 1

Seamless Upgrade with Improved Energy Performance

The new heating system was fully commissioned and left operational, delivering dependable, energy-efficient warmth throughout the garden centre. The client was pleased with the quality, speed, and cost-effectiveness of the upgrade.