Aviation Maintenance Facility Heating Installation – Bedford

Full Heating System Design and Installation

Heating Solution for Aviation Maintenance Facility

Full Heating System Design and Installation

Full Heating System Design and Installation

The project involved supplying and installing three Winterwarm warm air heaters, six de-stratification fans, all control systems, gas pipework, flues, wiring, and full system commissioning to provide an effective heating solution.

Tailored Heating Solution for Large Industrial Space

Following a comprehensive site survey, ABS proposed a customised heating system designed to maximise heat distribution and energy efficiency in the client’s high-ceilinged facility while meeting strict industry standards.

  • Supplied and installed 3 x 60KW Winterwarm warm air heaters.

  • Installed 6 x Winterwarm de-stratification fans for even heat distribution.

  • Provided complete control systems, gas pipework, flues, and full commissioning.

Content Image 1

Reliable, Efficient Heating for Aviation Facility

The client now benefits from a reliable, energy-efficient heating system that ensures consistent comfort and optimal working conditions throughout the facility, supporting their expanding operations.

Some of the brands we work with:

Get in touch

ABS Ltd are approved installers so do not hesitate to the industry experts.We will be happy to provide a free site survey and no obligation quotation.

Phone Icon

Book a free site survey