Project Overview
ABS was contracted by MCS Ltd to carry out a heating system upgrade at a major UK technology facility. The project involved the removal of outdated heating units and the installation of a new, efficient heating system to improve operational efficiency and energy performance.
Scope of Work
- Removal of two existing heaters and safe lowering to ground level.
- Installation of three new Powrmatic heaters supplied by MCS, along with associated controls and flues.
- Installation of new gas pipework, including gas cocks, test points, and solenoid valve.
- Comprehensive testing and commissioning to ensure optimal performance.
Execution & Delivery
The project was successfully delivered on time and in accordance with industry safety and efficiency standards.
ABS utilised high quality components sourced from our trusted suppliers, including Kernow Fixings, SBS, Thrive, and BES.
Outcome
The newly installed heating system provides improved heat distribution, energy efficiency, and reliability. The client now benefits from a modern heating solution tailored to the specific needs of their facility.
ABS’s professional approach and expertise ensured minimal disruption to site operations, delivering a seamless and effective installation.
For more details on ABS’s heating solutions, visit www.abs-radiantheating.co.uk.

Contact Us
Get in contact today to get a quote or to find out more.