Overview
A well known motorsport facility in Bristol needed an efficient heating and gas metering system to improve working conditions. The project involved installing heaters, destratification fans, and gas pipework while ensuring seamless integration with existing infrastructure.
Scope of Work
- ABS Installed 2 x 30KW Winterwarm heaters for reliable and efficient heating.
- Fitted and wired destratification fans (supplied by the client) to improve air circulation.
- Installed gas pipework and fittings from a designated point, ensuring safety and efficiency.
- Wired and commissioned destratification fans for optimal performance.
- Supplied and installed 2 x secondary gas meters for the spray booths, including fittings and thorough testing.
Challenges & Solutions
The project required careful coordination to integrate new installations without disrupting operations. Detailed planning and close collaboration with the client ensured a smooth and efficient process. All work was completed to industry standards, prioritising safety and reliability.
Outcome
The facility now benefits from a more efficient heating system, maintaining a comfortable working environment. The destratification fans help reduce heat loss, optimising energy use. The new gas meters enable accurate monitoring of gas consumption, improving cost efficiency.
This project highlights expertise in delivering practical heating and gas solutions for specialised environments, ensuring functionality, compliance, and sustainability.
ABS Ltd are approved installers so do not hesitate to get in touch with us, the industry experts.
We will be happy to provide a free site survey and no obligation quotation.

Contact Us
Get in contact today to get a quote or to find out more.