A Bristol printing company who have been operating since 1988, needed a quick fix to heat an additional building that they were going to occupy.
With no natural gas, the answer was a 30kw warm air heater with LPG cylinders to supply the fuel.
ABS supplied and installed a 30kw Winterwarm heater complete with a Winterwarm controller.
This project was completed within 2 days, including commissioning.